| 1. Hull lamination schedule per
construction plan #46?009?2
A. VINYLESTER resin used in first laminations below
waterline
B. All exterior gelcoat above waterline to be "AROCOAT"
or equal brand
C. Hull interior to be solid series laminated fiberglass - (no
coring)
D. Cabin sides to be cored with Divinicell cross-linked foam.
E. Cabin top and deck to be cored with 3 ½" squares
of End Cut Balsa .
2. Teak cap on the foredeck - Portuguese bridge
and aft deck continuing around the entire vessel. 1?1/4" thick
bedded in Polysulfide. - Varnish is optional
3. Ballast: 4000 lbs of internal iron laid
and glassed into keel. 600 additional lbs of lead for trimming ballast

|