| 1. Hull lamination schedule per
construction plan using vinylester resin in initial laminates below
the waterline. Deck lamination schedule per construction plan. All
exterior gelcoat to be CCP Taiwan brand.
2. Standard gelcoat colors to be
from CCP color chart
A. Hull- 944 A505 -- Grey
B. Deck- 944 W005 -- New Hatteras White
C. Boot top- 944 L020 -- Dark Blue
D. Non-Skid- 944 A505 -- Grey
E. Arch/exhaust stack- 944 W005 -- New Hatteras White
F. Flybridge stripe- 944 L020 -- Dark blue
3. Core
A. Cabin side (vertical surfaces): Termanto R75
B. Cabin top and deck (horizontal surfaces): Vertical end grain
balsa 20 mm thick
C. Hull interior: solid series of laminates
D. Hardware and bulkhead area - Termanto R260
E. Fwd Engine room bulkhead - 3/4" Nida Core
F. Tanks - Termanto R75 1/2"
G. Side decks, Portuguese bridge, inside bridge, exhaust arch
Termanto R75 (1/2")
4. Deck / hull joint
A. Between deck and hull flange: 3M 5200
B. Inside of joint: 3 layers M & W.R.
C. Mechanical fastening: 5/16" X 14 thru-bolt on 8"
centers
5. Longitudinal Stringer
A. Hull: 4 full-length port and starboard, engine beds and floor
stringers.
B. Deck: per design
6. Interior floors: Per design
7. Ballast: Iron - Approximately 3300 lbs
8. Salon cabin sole: 3/8" plywood +
3/8" plywood + 2" NADA CORE + 1/2" plywood + 1/2"
plywood

|