| 1. |
|
Hull lamination schedule per construction plan N86-HCP-00 the area below water line to use "Isophthalic" Gelcoat and vinylester resin for the first three (3) layers. Deck lamination schedule per construction plan #86-00-CP01. |
| |
|
|
| 2. |
|
All exterior FRP surfaces to be painted with Marine Grade LP paint except non skid |
| |
A. |
Hull- "Gray Stone" |
| |
B. |
Deck and deck house - "Snow White" |
| |
C. |
Boot top - "Flag Blue" |
| |
D. |
Non-skid - Arocoat Gelcoat to match "Gray stone" |
| |
E. |
Ventilation stack/flybridge - "Snow White" |
| |
F. |
Engine room and Lazarette - Arocoat Gelcoat to match Soundown white mesh engine room paneling. |
| |
G. |
All other bilges - Light gray Gelcoat same as N55. |
| |
|
|
| 3. |
|
Coring: |
| |
A. |
Cabin side (vertical surfaces): Klegecell # R80 varying degrees of thickness |
| |
B. |
Cabin top and deck (horizontal surfaces): Baltec or equivalent vertical end grain balsa, 1" thick |
| |
C. |
Hull and Superstructure to have "Coremat" 2mm anti print thru material in first series of lamination before roving is applied. Per construction drawing #N86-00-CP01 |
| |
|
|
| 4. |
|
Deck/hull joint: (see notes drawing #N86-00-CP-01) |
| |
A. |
Between deck and hull flange: 3M 5200 |
| |
B. |
Inside of joint: Three (4) layers M. & W.R. (where accessible) |
| |
C. |
Mechanical fastening: 1/2" thru-bolt on 6" centers |
| |
D. |
Teak cap: Across stern only, varnished |
| |
|
|
| 5. |
|
Longitudinal Stringer |
| |
A. |
Hull: Ten (10) full length each port and starboard (total of 20), engine beds and floor stringers per drawing # 86-00-CP-01 |
| |
B. |
Deck: per design drawing #N86-00-DKPL |
| |
|
|
| 6. |
|
Interior transverse floors: per design #86-00-CP-01 |
| |
|
|
| 7. |
|
Ballast: Approx. 30,000 lbs lead fixed per machinery layout drawing. 4,000 lbs of lead ingots supplied loose by builder. Vessel trimmed to suit during commissioning. |
| |
|
|
| 8 |
|
Water tight bulkheads per construction drawing to include, but not limited to the following areas: Between Lazarette and crew quarters , crew quarters and E/R, E/R and lower gusset cabins, Aft bulkhead of Fwd. Guest cabin, and chain locker/collision bulkhead. Use "Roxtec" thru bulkhead fittings |
| |
|
|