Hull lamination:
Schedule per construction plan, using mat and woven roving |
Vinylester resin used in first laminations |
All exterior gelcoat is Arocoat, Ferro - or equal |
|
Deck lamination:
Schedule per construction plan |
|
Core: |
Cabin side (vertical surfaces): Foam or equivalent cross-linked foam |
Cabin top and deck (horizontal surface): E.G.B. 9-12 lbs per sq ft |
Hull interior: solid series of laminates |
|
Deck/hull joint: |
Between deck and hull flange: 3M 5200 |
Inside of joint: Two (2) layers mat and woven roving |
Mechanical fastening: 1/4" (6.35 mm) x 20unc thrubolt on 6" (15.2 cm) centers where accessible. In areas that cannot be accessed self-tapping machine screws used |
|
Longitudinal Stringers: |
Hull: port and starboard, engine beds, and floor stringers - topside stringers -longitudinal and vertical |
Deck: per design |
|
Interior floors:
per design |
|
Ballast:
Internal lead 4000 lbs (1493 kg) - glassed in place (approx 1/2 weight of fuel) |
|
Hull Color: Arocoat #340 Grey |
Deck - Ferro "Super Shield" White |
Non Skid - Arocoat - to match CCP #A139 Grey |
Boot top - Arocoat - Dk Blue #348 |