Welcome to Nordhavn.com - Power Thats Oceans Apart
   
 
side_menu



Basic Structure

Hull lamination schedule per construction plan

Vinylester resin used in first laminations

All exterior gelcoat to be white Ferro Super Shield on superstructure andArocoat brand on hull and non-skid


Deck lamination schedule per construction plan


Core:

Cabin side (vertical surfaces): Foam Klegcell R75 or equivalent cross-linked foam

Cabin top and deck (horizontal surfaces): End grain balsa 9-12 lbs. per sq foot Baltek

Hull interior: Solid series of laminates


Deck/hull joint:

Between deck and hull flange: 3M 5200

Inside of joint: Two (2) layers mat and woven roving

Mechanical fastening: 1/4" (6 mm) x 20unc thru bolted on 6" (15 cm) centers where accessible. In areas that cannot be accessed self-tapping machine screws used


Longitudinal Stringer:

Hull: Five (5) full length port and starboard, engine beds and floor stringers - Topside stringers - longitudinal and vertical

Deck: Per design


Interior floors as done on N46 - Above engine room (salon) using deck beams and 2" (5.08 cm) insulation with aluminum screening over


Ballast: Internal lead to be determined at time of launch (approx. 1/2 weight of fuel)


Gelcoat Color (standard boat):

Hull: Arocoat#340 Gray

Deck: Ferro White Supershield

Non-skid: CCP #A139 Lt. Gray

Boot-top and stack stripes: Arocoat #348 Dark Blue


*Specifications subject to change without notice and at the discretion of designers and builders.
**Dimensions are subject to change with Buyer’s selected options and personal effects which may add to displacement and increase both draft and waterline length

Last updated: 7/28/09

 

 



Nordhavn Fleet

40

43

52

56MS

60

62

63

64

68

72

75EYF

76

78

86

120