Welcome to Nordhavn.com - Power Thats Oceans Apart
   
 
side_menu



BASIC STRUCTURE

Builder to utilize the latest vacuum bagging and resin infusion techniques on all main structures in order to save weight and increase strength.

Hull lamination schedule with cored top sides per construction plan

Vinyl ester resin used in first 3 layers of lamination

All exterior gel coat to be CCP on superstructure and on hull and non-skid or equivalent high end gel coat.

 

Deck lamination schedule per construction plan

 

Core:

Cabin side (vertical surfaces): Foam Gurit-G80 or equivalent cross-linked foam

Cabin top and deck (horizontal surfaces): Gurit cross linked foam per construction plan

Hull : Gurit cross linked foam per hull construction plan

In way of all hardware installations the core-cell to be replaced with plywood

Structural bulkheads to use Gurit foam

 

Deck/hull joint:

Between deck and hull flange: 3M 5200

Inside of joint:  Two (2) layers mat and woven roving

Mechanical fastening: 1/4" (6mm) self tapping screws on 6" (15 cm) centers. 

 

Longitudinal Stringer:

Hull: Per hull construction plans

Deck: Per deck construction plans

 

Interior floors: Honeycomb cored FRP per construction plans

 

Gel coat Color (standard boat):

Hull: Arocoat #340 Light Gray

Deck: Ferro White (GV48001)

Non-skid: Arocoat #A139 Light Gray

Boot-top and stack stripes: Arocoat #348 Dark Blue

 

Bottom Paint (Black)

5 coats Petit Protect epoxy barrier coat

3 coats of Petit Trinidad SR anti-fouling paint


*Specifications subject to change without notice and at the discretion of designers and builders.
**Dimensions are subject to change with Buyer’s selected options and personal effects which may add to displacement and increase both draft and waterline length

Last updated: 7/14/14

 

 


Nordhavn Fleet

40

43

52

56MS

59CP

60

63

64

68

72

75EYF

76

78

96

120