Welcome to Nordhavn.com - Power Thats Oceans Apart
   
 
side_menu



Basic Structure

Hull lamination schedule per construction plan #62-003-R-4 the area below water line to use vinylester resin for first three (3) layers. Deck lamination schedule per construction plan #62-003-R-4. Construction plans pertaining to structure approved and certified by AMERICAN BUREAU OF SHIPPING (ABS). Standard gelcoat colors

A. Hull - Grey #A505
B. Deck and deck house- New Hatteras White
C. Boot top - Dark blue #LL020
D. Non-skid - Grey #A505
E. Radar mast - New Hatteras White

Core

A. Cabin side (vertical surfaces): Airex R6280
B. Cabin top and deck (horizontal surfaces): Vertical end grain balsa 3/4" thick
C. Hull interior: solid series of laminates

Deck / hull joint: (see notes dwg no. 62-003-R-4 1/2)

A. Between deck and hull flange: 3M 5200
B. Inside of joint: three (3) layers M & W.R.
C. Mechanical fastening: 3/8" x 14 thru-bolt on 8" centers
D. Teak cap: bedded in Polysulfide and varnished. 1" thick on inside of coaming and 1 1/4" thick on outside of coaming

Longitudinal Stringer

A. Hull: four (4) full-length port and starboard, engine beds, and floor stringers
B. Deck: per design #62-003-R-5 sht 1/2 and 2/2

Interior floors: per design #62-003-02-ALT1

Ballast: 6,000 lbs lead fixed per machinery layout drawing. 1,500 lbs of lead pigs supplied loose by builder. Vessel trimmed to suit during commissioning.


*Specifications subject to change without notice and at the discretion of designers and builders.
**Dimensions are subject to change with Buyer’s selected options and personal effects which may add to displacement and increase both draft and waterline length

Last updated: 4/20/08

 

 



Nordhavn Fleet

40

43

52

56MS

60

62

63

64

68

72

75EYF

76

78

86

120