Hull lamination schedule per construction plan. The area below water line to use "Isophthalic" Gelcoat and vinylester resin for the first three (3) layers. Deck lamination schedule per construction plan |
|
Standard colors from PAE provided color chart. All FRP surfaces to be painted with Awlgrip Awlcraft 2000 Acrylic Urethane paint except non skid |
Hull - "Gray Stone" |
Deck and deck house - "Snow White" |
Boot top - "Flag Blue" |
Non-skid - Arocoat Gelcoat to match Awlgrip "Gray stone" |
Engine room and lazarette - Arocoat Gelcoat to match Soundown white mesh engine room paneling |
All other bilges - Light gray Gelcoat same as N55 |
|
Coring: |
Cabin side (vertical surfaces): Klegecell # R80 varying degrees of thickness |
Cabin top and deck (horizontal surfaces): Baltec or equivalent vertical end grain balsa, 1" (2.5 cm) thick |
Hull and superstructure to have "Coremat" 2 mm anti print thru material in first series of lamination before roving is applied. Per construction drawing |
|
Deck/hull joint: |
Between deck and hull flange: 3M 5200 |
Inside of joint: Three (3) layers M. & W.R. (where accessible) |
Mechanical fastening: 1/2" (1.27 cm) thru-bolt on 6" (15.2 cm) centers |
Teak cap: Across stern and side deck forward to station 8 |
|
Longitudinal Stringer |
Hull: Ten (10) full length each port and starboard (total of 20), engine beds and floor stringers per drawing |
Deck: per design drawing |
|
Interior transverse floors: per design |
|
Ballast: approximately 19,500 lbs (8863 kg) lead fixed per machinery layout drawing. Additional ballasted added during tank testing for trim. |
|
Water tight bulkheads per construction drawing to include, but not limited to the following areas: Between lazarette and engine room , engine room and lower guest cabins, and chain locker/collision bulkhead. Use "Roxtec" thru bulkhead fittings |