Hull lamination schedule per PAE design the area below water line to use "Isophthalic" Gelcoat and vinyl ester resin for the first three (3) layers. Deck lamination schedule per construction plan per PAE design. “Cymax” fiberglass will be used for all deck lamination and small part lamination. 2 mm Coremat to be added to lamination to eliminate print through |
|
Standard Gelcoat Colors from CCP color chart. Gelcoat for deck and superstructure to be Ferro brand "Ultra Shield" white |
Hull- Arocoat #340 Gray |
Deck and deck house - Ferro Ultrashield White |
Boot top - Arocoat #348 Dark Blue |
Non-skid - Light Gray # A110 |
Flybridge/Hardtop - Ferro Ultrashield White |
|
Coring |
Cabin side (vertical surfaces): Klegecell # R75 varying degrees of thickness |
Cabin top and deck (horizontal surfaces): Baltec or equivalent vertical end grain balsa, 1" (2.5 cm) thick |
Hull and Bulbous bow: Solid series of laminates |
|
Deck/Hull Joint |
Between deck and hull flange: 3M 5200 |
Inside of joint: Three (3) layers M. & W.R. (where accessible) |
Mechanical fastening: 3/8" x 14 thru-bolt on 8" centers (9.5 mm x 14 thru-bolt on 20.3 cm center) |
|
Longitudinal Stringer |
Hull: Nine (9) full length each port and starboard (total of 18), engine beds and floor stringers |
|
Ballast: Approx. 20,000 lbs (9091 kg) lead fixed. Vessel trimmed to suit after launch in An Ping Harbor |