Bookmark and Share

 

A Nordhavn tale of thanks and giving
Update on the N63

Production on the Nordhavn 63 is humming along and anticipation is amping up over what is destined to be the line’s next big success story. Already, three 63s have gone to contract sight unseen. Fans of the 63 love its aft wheelhouse styling and space planning - including a large engine room with clearance of more than 6 feet. Plus, the 63 will feature the same gorgeous hardwoods, fixtures, appliances and decorative touches as our larger designs. Project manager Mike Jensen is currently at the factory inspecting progress on the N63. As depicted in the latest round of photos, South Coast factory craftsmen are finalizing the interior component assembly prior to enclosure of the pilothouse. “The boat is looking great,” said Mike. “I think she’s going to be even more impressive than people are expecting.”

Completion of hull one is slated for late summer.

 

 


previous page

     
     
©2010 Pacific Asian Enterprises
®2010 Nordhavn ~ ™2010 Nordhavn
Website comments?
 
Created and Designed by Harlow Media Arts